BILL OF QUANTITIES

Bill of quantities service for builders and contractors

A fully measured, priced Bill of Quantities from your drawings, structured to NRM, with preliminaries, overheads and profit, and an inclusions and exclusions schedule, ready to tender.

Get your estimate£250 + VAT per single dwelling · back in 24–48 hours

What's in your Bill of Quantities

  • Element-by-element structure to NRM
  • Measured quantities with units and descriptions
  • Rates referenced to Spon's, or your own internal rates
  • Preliminaries, overheads and profit
  • Inclusions and exclusions schedule
  • Clarifications and assumptions schedule
  • Marked-up drawings showing every measured quantity
  • Your logo and company details on every page

Why a proper BoQ wins tenders

A clear, itemised Bill of Quantities shows a client exactly what they're paying for, makes your price easy to compare and gives you a firm basis for valuing variations later. It also protects your margin: if it isn't in the bill, it isn't in your price.

Not sure what a BoQ includes?

Read our guide, What is a bill of quantities?

Included in every estimate

Spon's-referenced pricing

Rates benchmarked against Spon's price books and adjusted for location, or priced with your own rates.

Full QA check

Quantities, rates, totals and omissions checked against the drawings by our professional consultancy team.

Clarifications schedule

Gaps, conflicts and assumptions logged so you can raise them with the client or carry them as qualifications.

Marked-up drawings

Every measured area, length and count colour-coded on the sheets so any quantity can be traced.

How it works

  1. 01

    Upload and pay

    Send your drawings, logo and any internal rates, choose your service and pay securely at checkout.

  2. 02

    We measure and price

    Every item is taken off, marked up on the drawings and priced against Spon's or your rates.

  3. 03

    Professional QA

    Peters Cost Consultants Ltd checks quantities, rates and exclusions and raises clarifications.

  4. 04

    Delivered

    Your branded pack lands in your inbox in 24–48 hours, or within 24 hours with express.

Frequently asked questions

What format will I receive?

A branded Bill of Quantities document with the clarifications schedule and marked-up drawings as PDFs. Ask if you also need the BoQ as a spreadsheet.

Is the BoQ structured to NRM?

Yes. Our bills follow the NRM elemental structure, so a client's quantity surveyor can read and compare them easily.

How long does it take?

24–48 hours as standard, or within 24 hours with express for £50 + VAT.

Related services

Ready to price your next job?

Upload your drawings, pay securely and get a professionally checked estimate back in 24–48 hours.

Get your estimate